DOWNLOAD: Sur IPP Project Finance Modeling Summary in PDF
2) Type : Gas-fired combined cycle power generation plant
3) Capacity : Contracted power capacity of 2,000 MW
Comprises three blocks, (2 x 800 MW) and (1 x 400 MW)
27.8% of the MIS* total currently contracted capacity of approximately 7,197 MW
4) Plant Efficiency (Heat Rate ) : 56.4% (1.77)
5) Major equipment :
| Equipment | Q'ty | Manufacturer |
| Gas turbine | 5 | Siemens |
| HRSG* | 5 | Nooter Eriksen |
| Steam turbines | 3 | Fuji Electric |
Source: Phoenix Power Company SAOG IPO Prospectus