5/06/2015

Peru LNG Project Finance Case Study Summary

DOWNLOAD: Peru LNG Project Finance Case Study Summary in PDF



   Source: http://www.hydrocarbons-technology.com/projects/peru-lng/peru-lng2.html


1) Location: Along the Pacific ocean and 600km from the Amazon jungle
2) 600km - 200km existing, 408km, 34 inch to built
3) Construction due date: by 2010
4) Plant: 52ha at Pampa Mechorita, 167km south of Lima,
■ Near Pan American highway
■ Beneficial for shipment & NIMBY
■ Near Camisea gas field -> Easy access for natural gas supply
5) Practicalities
   ■ Panama canal expansion -> Easier access to Europe
   ■ Cut Mexican demand -> Lower prices for US consumers
6) Possibility to expansion of another train.
 Repsol discovered more gas in Block 57.
 Petrobras is drilling in Block 110.


Source: http://www.pfie.com/unshakable-peru-lng/21073480.fullarticle